Shoring and Bulk excavation works at 298-300 Taren Point Road Caringbah are proceeding as planned. The boys from A.C.E Civil are doing a great job. ACSES Engineers are proud to be part of the Design Team and honoured to be the Project Structural Engineer.

298-300 Taren Point Road Caringbah

298-300 Taren Point Road Caringbah

Here are the 3D perspectives.

298-300 Taren Point Road Caringbah 3d Perspectives